08-08-2013, 04:55 PM
For those lucky to have an extra bolt, that is a smart option; although in increases the logistics a bit. Any word on whether Maxim can produce in a timely manner to have a bolt ready for the Lilja? Last I heard 16 weeks was the lead time for the barrels. Any guess on the bolts? Anybody had time to make initial contact with the POC at Maxim?

