12-18-2018, 02:35 PM
Bite me. I'd kill to be able to step outside and do simple initial load development before I need to verify at 300. Save a lot of money in lead and powder, never mind time and gas. My options are an hour 45 away.
Sticks
Catchy sig line here.
Catchy sig line here.

