01-16-2016, 05:02 AM
LRRPF52 Wrote:We could organize a group buy for a 20 MOA 1-piece base for this, but we would need to have some testing done to show that it doesn't interfere with ejection, and matches perfectly to the OD of the receiver, with correctly spaced holes that are drilled and tapped to spec.
+1 Something to keep in mind since they begin to arrive in June. A prototype gets developed with the above considerations addressed. adamjp's friend has a "leg up" since he has developed rails for other mini actions. Wouldn't it be nice if LSI would get on board?

